Image Up Advertising & Design

Four Seasons Breeze, September 2019

Issue link: https://imageup.uberflip.com/i/1159826

Contents of this Issue

Navigation

Page 23 of 67

24 FOUR SEASONS BREEZE | SEPTEMBER 2019 Finance Committee The Finance Committee held its regular meeting on July 30. The financial statement for June 2019 was reviewed and recommended for BOD approval. Highlights of the June financial report follows: Total Assets are $9,452,017 including checking $674,461 and reserve assets of $7,362,644. Operating money market and CDs totaled $1,289,859. Total Liabilities currently are $340,245 and Total Equity of $1,749,369 is a surplus balance. There was a net income gain for the month of $51,941. Front yard cost center expenses were under budget by $9,722 (driven by less water usage) and Springdale cost center expenses were over budget by $1,775. The overall budget variance continues to be attributed to several line items that have had lower utilization/expenses associated during this time period, e.g. water, tree trimming, and landscaping, but are expected to increase in the coming months. At the midpoint of the 2019 budget cycle, our budget stands in a favorable position. Our income is at 105 percent YTD and operational expenses are 90 percent of budget. Twelve proposals were reviewed. Nine proposals were recommended for Board approval and three were returned to the committee for additional information. Six committee persons and Board Liaison, Ed Paules, were present. There is an opening on the Finance Committee. If you are interested, please come to our next meeting on Sept. 24, 1 pm, in the RCN Conference Room. ~ Baron Ginnetti, b2ginnetti@gmail.com Facilities Committee The Potrero gate house drywall will be repaired due to a drainage issue that occurred in an adjacent planter. In addition, the interior of the gate house has deteriorated to an unacceptable condition. The drywall will be repaired and the interior of the gate house painted. The flooring will be replaced and new cabinets and countertops installed. The Summit spa plaster will be replaced due to damage caused by mechanical issues that have been resolved. The coping and water line tile will also be replaced. Privacy curtains have been installed in the dressing areas at The Lodge, The Summit, and The Courts facilities. The replacement of the aerobics room floor in the Spa building was approved by the Board of Directors. A number of residents attended our meeting and expressed the need for fans to increase the airflow in the aerobics room. The committee is reviewing the request. The Facilities Committee meets in the RCN building on the second Wednesday of the month at 10 am. We always welcome residents to join us and share their ideas or concerns. We currently have several positions open on the Facilities Committee for anyone interested in serving our community. ~ Bruce Lewis, b.lewis2794@sbcglobal.net

Articles in this issue

Links on this page

view archives of Image Up Advertising & Design - Four Seasons Breeze, September 2019