Image Up Advertising & Design

Terra Lago Roadrunner August 2026

Issue link: https://imageup.uberflip.com/i/1545884

Contents of this Issue

Navigation

Page 1 of 15

FOUR SEASONS TERRA LAGO ROADRUNNER COMMUNITY ASSOCIATION INFORMATION The Lodge: 85370 Terra Lago Pkwy., Indio, CA 92203 • 760-863-2399 Lynne Cesario, General Manager Lynne.cesario@fsresidential.com Erika Andrade, Assistant General Manager Erika.andrade@fsresidential.com Mel Mendez, Lodge Attendant Mel.mendez@fsresidential.com Jacob omas, Lodge Attendant Jacob.thomas@fsresidential.com Travis Carlson, Lifestyle Coordinator Travis.carlson@fsresidential.com Joe Villarreal, Maintenance Technician Jose.villarreal@fsresidential.com Front Gate Attendant: 84930 Terra Lago Pkwy., Indio, CA 92203 • 442-400-3249 Front Gate Call Box: 442-400-3283 (displays on your phone when a guest is contacting you) Back Gate Call Box: 760-775-2275 (displays on your phone when a guest is contacting you) BOARD OF DIRECTORS President: Michael Scoggins mike.scoggins.fstlbod@gmail.com Vice-President: Steven Hartje stevehartje.fstlboard@gmail.com Treasurer: Dave Adler daveadler.fstlboard@gmail.com Secretary: Eva Macera evamacera.fstlboard@gmail.com Sergeant at Arms: Maria Miller-Carelock cmillercarelockfstlhoa@gmail.com PUBLICATION FSTL Newsletter Team Lesley Attanese • Shirley Schuman • Chuck Stevens Eva Macera, Board Liaison • Mel Mendez, Assistant Editor email: roadrunner.fstl@gmail.com Production Image Up Advertising & Design ARTICLE SUBMISSIONS All submissions must be emailed to roadrunner.fstl@gmail. com no later than the 4th of the month. Club and group articles may not exceed 400 words and no more than three photos may be included. e Roadrunner is published monthly by the Four Seasons Terra Lago Community Association and Image Up Advertising & Design. This publication is copyrighted and may not be reproduced or reprinted without the written permission of both publishers. Submitted articles published at the approval and discretion of the FSTL Roadrunner Newsletter Team. ADVERTISING Contact Image Up at (909) 797-3647 or imageup1@verizon.net 2 FOUR SEASONS TERRA LAGO ROADRUNNER | AUGUST 2026 By Lynne Cesario, General Manager A common question we receive is, "Why do projects take so long?" Every project follows a structured approval process designed to ensure the Association receives the best value while using homeowners' funds responsibly. Although this process takes time, each step is important. Most projects begin with an idea, either from a homeowner, committee member, Board member, or Management. The idea is then presented to the appropriate committee who then discusses the scope of work and determines what is needed. If vendor proposals are needed, Management schedules a site walk with qualified contractors. This allows all vendors to view the project under the same conditions, ensuring comparable "apples-to-apples" bids. Once the proposals are received, they are returned to the committee for review. The committee evaluates the bids based on scope of work, qualifications, and value before recommending the vendor they believe is best suited for the project. The recommended proposal is then submitted to the Finance Committee. Their role is to determine how the project should be funded. Projects generally fall into one of three categories: • Capital Expense: A new asset that does not currently exist in the community and will be added to the Reserve Study after installation. • Operating Expense: Routine costs, such as seasonal f lower replacements, maintenance, or renewing an existing service contract. • Reserve Expense: The replacement or major repair of an existing Association- owned asset, such as the recent cabana replacement project. After the Finance Committee completes its review, the proposal is presented to the Board of Directors for consideration. The Board may approve the project, deny it, or table it if additional information is needed. When a project is tabled, it is typically postponed until the next Board meeting, which can extend the timeline by a month or more. Once approved, Management works with the selected vendor to schedule the project. However, contractor schedule, availability of materials, permits, and weather can all affect when work begins. While the process may appear lengthy, every step is intended to ensure thoughtful planning, competitive pricing, proper financial oversight, and responsible use of Association funds. We appreciate your patience as we work through this process to deliver quality improvements that benefit the entire community. General Manager's Report

Articles in this issue

Links on this page

view archives of Image Up Advertising & Design - Terra Lago Roadrunner August 2026